THE CHALLENGE

After acquiring the existing Saltmarshe Castle caravan park, they required an increased electrical supply as the site was at capacity and had plans to increase the number of caravans on the site.

Our Solution

  • Using a connection to an overhead line, a 500kVA substation was installed and commissioned by Rock Power Connections.
  • The Rock Team worked closely with the civil and electrical contractors on site to ensure that the onward LV connections were to specification.
  • The connection needed to be completed out of season to avoid any disruption to the site residents.

“One important factor was the location of the sub stations to be in keeping with the forest surroundings. The client relied on us for a fast, efficient service and to take care of everything, which we did.”

Colin Green, Project Manager