Upgraded LV supply to a new office development

Dakota is an impressive new Grade A office building positioned at the entrance to the internationally renowned Brooklands estate in Weighbridge.

The Challenge

Whilst there was an existing 275kVA supply to the site, Rock Power Connections were set the task of installing a new supply of 450kVA.

In agreement with the network operator, the supply was installed over two LV connections; negating the need for a substation and providing the most commercially feasible solution for the client.

Our Solution

* The Rock Team installed a 450kVA supply to site, using two LV point of connections from a local substation.

* The Project Manager worked closely with the Site Manager to ensure that the onsite civil works, including the laying of ducts, was completed to the DNO’s specification.

* The Rock Team then installed 65 metres of LV cable to two 400A Heavy Duty Cut Outs.

“Working closely with the developer and UKPN were very important on this project, this was to ensure a quick turnaround and quality installation for the end client. Our partners and suppliers played a big part in the delivery”

Rob Davies – Project Manager