UPGRADE SUPPLY TO ICS COOL FACTORY

ICS Cool are specialists in process cooling, heating and HVAC. Due to their continued growth, they required an upgrade to their electricity connection to provide a 1600A supply.

THE CHALLENGE

* Rock Power Connections provided a full turnkey solution, including trenching and the substation plinth.

* The trenches for the High Voltage cable were in a reinforced concrete flooring, requiring diligent civils.

OUR SOLUTION

* The installation comprised a 1MVA package substation in a GRP housing and the connection of the LV cables tails into a 1600A cutout.

* Our Project Manager assisted with the design of the LV panel to best suit the installation.

“Rock was excellent”

Pete, ICS Cool