Drake House Crescent

Case study

Drake House Crescent

Install two HV (High Voltage) substations in a newly redeveloped industrial estate, with on-going LV (Low Voltage) supplies to four warehouses in Sheffield.

Our Approach

This installation was on a client lead construction site, where we worked in collaboration with their civils company to install the new equipment, to be adopted by NPG and the IDNO.

The site provided several challenges, including difficult ground conditions, meaning substation positions had to be reconsidered, ensuring they were futureproofed and protected from vandalism. Sadly, a theft of materials also took place whilst the site was under construction.

However, never to be deterred, the team were able to over comes these challenges and the project was completed ahead of time. A great result for everyone.

The Result 

We managed the clients’ expectations effectively despite the unfortunate actions of others, and the site was energised ahead of timescales set for the project.

“This was a client ran construction site working alongside their civils company to install the equipment to be adopted by NPG (Northern Power Grid) and the IDNO (Independent Network Operator).”

Simon Cobb, Project manager, Rock Power Connections