The Challenge:

An Aldi store, built on a vacant plot of a redevelopment master plan in Widnes, needed an electrical connection.

Although the electrical load was a modest 210kVA, the Point of Connection was granted at High Voltage (HV).

As work was undertaken in a busy area, getting an appropriate traffic management plan in place was key.

Hitting a tight schedule was also critical to meeting the store opening date.

Our Solution:

The Rock Team supplied a 315kVA package substation in a GRP enclosure with a 400A Heavy Duty Cut Out within the store.

Rock’s in-house civils team carried out all offsite excavation and reinstatement and built the substation plinth to DNO standards.

With considerable off and on-site cable routes, working closely with the council and traffic management team was imperative to ensure a safe working environment near excavations.

“Working closely with the customer and the site management team, we were able to energise the supply ready for the store opening.”

Rob Davies, Project Manager