Case study

A 650KVA supply to a new NHS Integrated Care Centre

Sewell Construction built a new NHS Integrated Care Centre in Hull, on the site of a former school. The centre provides tailored care for the elderly to prevent unnecessary hospital admissions.

The Challenge

The Rock Team were set the task of installing the new supply using an internal 800kVA substation.

Our Solution

  • Close liaison with the developer to ensure the onsite civils met the correct specification.
  • There was a long cable run to the substation passing through an adjoining site which was being developed with residential dwellings.
  • The Rock Team managed the installation despite facing atrocious weather. The final jointing was completed during snow!

“The team were set the challenge of carrying out this project for the developer. Although proven to be challenging on many aspects, we endeavoured to carry out a quality installation.”

Rob Davies – Project Manager